This reduces network latency and ensures efficient

Innovative solutions for data management and analysis.
Post Reply
Mostafa044
Posts: 18
Joined: Thu May 22, 2025 5:05 am

This reduces network latency and ensures efficient

Post by Mostafa044 »

With a seismic strength of up to 8 degrees and a load-bearing capacity of 800 kg per square meter, the facility maximizes the security of customer equipment and data in a variety of challenging situations. Its network advantages include both China Telecom's 2000M and China Netcom's 1000M fiber optic networks, a dual-point redundant line structure, and imported advanced equipment, enabling seamless dual-line service with a single machine, single network card, and dual IP addresses. , reliable, secure, and stable network connectivity. The computer room is powered by an independent 630KW mains transformer. A large-capacity 630KW phone number database generator provides backup power, automatically starting within 15 seconds in the event of a mains power failure. A 1+1 redundant French Merlin Gerin 200KV UPS provides 20-30 minutes of power in the event of a mains power outage. The computer room utilizes a redundant, dedicated precision air conditioning system, using an upper air supply and lower air return system to precisely control the room's temperature and humidity to 23±2°C and relative humidity to 45%-65%. Sixteen redundant BOKA constant temperature and humidity air conditioners are installed in the room, ensuring 2.4kW of cooling capacity per rack.

Image

The air supply system delivers clean, fresh air at high pressure, ensuring optimal operating conditions for customer network systems and ensuring the lifespan of their equipment. The cabinets and power supplies are standard 49U racks. Dual power supplies provide a total of 12A per rack. Fire protection: The internal fire extinguishing system utilizes a centrally controlled HFC-227ea intelligent gas fire extinguishing system. Supporting facilities utilize strict fire-resistant materials, ensuring overall fire protection meets telecommunications-grade standards. Sixteen cameras are installed in the computer room's exterior corridors, at all entrances and exits, and within the room itself. A hard disk recording system is used to store footage for 14 days. The security system utilizes digital video surveillance, an IC electronic access control system, and detailed access and exit registration services. Access control system records and entry and exit registration services are maintained for one year. Strict 24/7 monitoring is implemented, and video footage is retained for 14 days. External personnel must obtain access passes in advance or obtain company authorization and make an appointment. Access to the computer room requires passing through two entry and exit security checkpoints and two access control gates. 24/7 network connection status monitoring, traffic monitoring, and telecom-grade professional technical maintenance ensure immediate response and support.
Post Reply